Does it handle both the shop and the field?
Yes — that’s the whole point. Shop fabrication and field erection are phases/sequences of the same job; hours clock against each, and the job jacket rolls up shop + field into one live margin. You see where the money is made or lost across both.
Can it track tonnage, pieces and crane hours?
Yes. Upload the job’s piece list to its Pieces tab and mark pieces as they go up — it counts members and tons installed, shown beside the crew-reported percent complete (it never changes the money). Cranes and man-lifts are equipment on the job: crews log usage hours against it, and the job carries its own equipment budget line.
Do you have training for ironworkers and fabricators?
Yes — the WE Training library includes a full Ironworker & Fabricator track (Introduction, How Buildings Are Built, How to Read Steel Construction Drawings, the Steel Fabrication Process and Steel Erection Process courses, Your Tool Kit) plus OSHA courses (Fall Protection for Construction, Rigging Level 1 & 2, Working Around Cranes, Aerial & Scissor Lift Operators, Forklifts & Telehandler Operators).